FINDING · DEPLOYMENT
IODA data confirmed the February 28, 2026 Iran shutdown was implemented via BGP route withdrawals and collapse of IP-space announcements, not merely application-layer blocking — the underlying routing infrastructure itself was withdrawn.
From 2026-gusgustavo-iran-internet-shutdown — Iran: Internet shutdown from 7 UTC 28 February 2026 · Issue body (IODA reference) · 2026 · net4people/bbs
Implications
- Circumvention tools relying on IP reachability to any external host (including Tor bridges, Shadowsocks, VPN endpoints) become inoperative under BGP-level shutdowns; only in-band protocols (DNS, ICMP) may survive.
- Pre-distribute configurations for DNS-tunneled fallback channels to users before a shutdown event, since BGP-level interventions leave no time for in-band bootstrap.
Tags
Extracted by claude-sonnet-4-6 — review before relying.